Reckahn Solar Park

Reckahn Solar Park
Map
CountryGermany
LocationReckahn, Kloster Lehnin, Brandenburg
Coordinates52°20′N 12°33′E / 52.333°N 12.550°E / 52.333; 12.550
StatusOperational
Commission date2010, 2011
Solar farm
TypeFlat-panel PV
Site area85 ha (210 acres) Site plan
Power generation
Nameplate capacity37.7 MWp

Reckahn Solar Park is a photovoltaic power station in Reckahn, southwest of Berlin, Germany. It has a capacity of 37.7 megawatt (MW) and was constructed in three phases.[1][2][3] Reckahn I was 22.661 MW covering 56 hectares (140 acres) and was built by Beck Energy GmbH (Belectric) using 292,000 First Solar thin-film CdTe-panels, and was expected to produce about 22 gigawatt-hours per year.[4] Reckahn II added 13.3 MW, using 172,000 modules on a 35 hectares (86 acres) site.[5] Reckahn III, completed in 2011, added 1.8 MW, bringing the total to 37.7 MW. The FIT is 21.1 Euro cents per kilowatt-hour.[6]

See also

References

  1. ^ Large-Scale Photovoltaic Power Plants Archived 1 January 2016 at the Wayback Machine
  2. ^ Projects
  3. ^ LBBW finanziert Photovoltaikparks in Bayern und Brandenburg
  4. ^ BayernLB provides financing for the Reckahn I solar power plant in Brandenburg
  5. ^ LBBW Landesbank Baden-Württemberg, LBBW finanziert Photovoltaikparks in Bayern und Brandenburg, 15 September 2010
  6. ^ Solar-Deutschlandportfolio 4


Retrieved from "https://en.wikipedia.org/w/index.php?title=Reckahn_Solar_Park&oldid=1154835873"