Kibo Gauteng Thermal Power Station

Kibo Gauteng Thermal Power Station
Kibo Gauteng Thermal Power Station
Kibo Gauteng Thermal Power Station
Kibo Gauteng Thermal Power Station
Kibo Gauteng Thermal Power Station (South Africa)
CountrySouth Africa
LocationGauteng Industrial Park, Gauteng
StatusProposed
Construction began2022 Expected
Commission date2023 Expected
Construction costUS$12 million
Owner(s)Sustineri Energy
Operator(s)Sustineri Energy
Thermal power station
Primary fuelPlastics
Power generation
Nameplate capacity2.7 MW (3,600 hp)

Kibo Gauteng Thermal Power Station is a planned 2.7 megawatts (3,600 hp) thermal power station in South Africa. The power station is under development by a joint venture company called Sustineri Energy, co-owned by Kibo Energy, an Irish IPP and Industrial Green Energy Solutions (IGES) of South Africa. The energy generated here will be sold directly to a developer of industrial parks, based in Gauteng, South Africa, under a 10-year power purchase agreement (PPA) between the parties.[1][2]

Location

The power station would be located in Gauteng Industrial Park, in Gauteng Province, where both Johannesburg, the country's business centre and Pretoria, South Africa's capital city are located.[1][2]

Overview

The power station is being developed to supply baseline electricity to a developer of industrial parks in Gauteng Province, South Arica. The process involves the incineration of selected plastic waste at above 400 °C (752 °F) in the absence of oxygen, in a process called pyrolysis. This produces synthetic gas (syngas) and heat. The syngas is used to drive generators to produce electricity and the heat is sold to other industries in the industrial park.[1][2][3]

It is anticipated that in 24 to 26 months, business will have picked up to warrant the expansion of the power station, tripling its output to 8 megawatts.[1][2][3]

Developers

The owners/developers of this energy infrastructure have formed a joint venture company, named Sustineri Energy, which will own, design, finance, develop, build, operate and maintain this power station. The table below illustrates the shareholding in Sustineri Energy.[1]

Shareholding In Sustineri Energy
Rank IPP/Developer Domicile % Ownership Notes
1 Kibo Energy Plc Ireland 65.0 [1]
2 Industrial Green Energy Solutions Pty South Africa 35.0 [1]

Construction and timeline

The construction of the power station is budgeted at ZAR:180 million (approx. US$12 million). Construction is expected to start in the second half of 2022 and last about 12 to 14 months. The engineering, procurement and construction (EPC) contract was awarded to Lesedi of South Africa. The same company was also selected as the "operations and management contractor".[1][2]

See also

References

  1. ^ a b c d e f g h Marleny Arnoldi (14 February 2022). "Kibo to build plastics-to-syngas plant in Gauteng industrial park". Engineering News South Africa. Bedfordview, Johannesburg, South Africa. Retrieved 4 March 2021.
  2. ^ a b c d e Inès Magoum (16 February 2022). "South Africa: Kibo to generate electricity from plastics in Gauteng". Afrik21.africa. Paris, France. Retrieved 4 March 2022.
  3. ^ a b African Review (23 February 2022). "Kibo Energy signs 10-year clean energy PPA on South Africa waste to energy project". Africanreview.com. London, United Kingdom. Retrieved 4 February 2022.

External links

  • Kibo Energy to build, operate waste-to-energy project in South Africa As of 14 February 2022.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Kibo_Gauteng_Thermal_Power_Station&oldid=1148671255"