Wairau Hydro Scheme

Wairau Hydro Scheme
Country
  • New Zealand
LocationWairau River
StatusProposed
Owner(s)TrustPower
Thermal power station
Primary fuelHydro
Power generation
Nameplate capacity70 MW (94,000 hp)

The Wairau Hydro Scheme is a canal based hydroelectric project proposed by TrustPower on the Wairau River in Marlborough, New Zealand. The $280 million project would divert up to 60% of the river through 49 kilometres (30 mi) of canals to generate up to 70 megawatts (94,000 hp) of electricity.[1]

Resource consents

Resource consents for this project were granted in 2008.[2] This decision was appealed to the Environment Court, which in 2010 decided in favour of the project.[3] However, TrustPower put the project on hold in 2012, due to low electricity prices combined with rising construction costs.[4] Consents for the scheme lapsed in 2021.[5]

See also

References

  1. ^ "Controversial Wairau scheme gets green light". The Nelson Mail. 26 November 2010. Retrieved 27 November 2010.
  2. ^ NZPA (5 August 2008). "TrustPower gets resource consent for Wairau hydro scheme". NZ Herald.
  3. ^ "Hydro scheme gets green light". The Marlborough Express. 26 November 2010.
  4. ^ Simpson, Heather (26 January 2016). "TrustPower keeping Marlborough hydro-electric scheme on its radar". The Marlborough Express. Retrieved 19 June 2019.
  5. ^ "Hydro generation stack update for large-scale plant". Roaring40s. 24 September 2020. p. 15. Retrieved 1 July 2021.

External links

  • TrustPower website


Retrieved from "https://en.wikipedia.org/w/index.php?title=Wairau_Hydro_Scheme&oldid=1219528655"