Vilnius Biofuel Power Plant

Vilnius Biofuel Power Plant
2022
Map
Official nameVilniaus kogeneracinė jėgainė
CountryLithuania
LocationVilnius
Coordinates54°40′4″N 25°9′24″E / 54.66778°N 25.15667°E / 54.66778; 25.15667
StatusOperational
Construction began2016
Commission date2021
Construction cost340 million [1]
Owner(s)Ignitis grupė
Thermal power station
Primary fuelWaste
Secondary fuelBiofuel
Power generation
Nameplate capacity88 MW (electricity)
227 MW (heat)

Vilnius Biofuel Power Plant is a waste-to-energy plant in Vilnius, Lithuania.[2][3] The plant produces 40% of all annual heating requirements for the city of Vilnius.[1]

It was built next to decommissioned Vilnius Combined Heat and Power Plant and utilises some of the infrastructure.

References

  1. ^ a b Milijonus Lietuvai kainavusios jėgainės gali tapti pačių sau paspęstais spąstais: rizikuojame atsidurti ant pavojingos ribos
  2. ^ Vilniaus kogeneracinė jėgainė baigė dar vieną biokuro jėgainės statybos pirkimą
  3. ^ Į Vilniaus kogeneracinę jėgainę pradedamos vežti pirmosios komunalinės atliekos

External links

  • Official website


Retrieved from "https://en.wikipedia.org/w/index.php?title=Vilnius_Biofuel_Power_Plant&oldid=1165405996"