This is not a Wikipedia article: It is an individual user's work-in-progress page, and may be incomplete and/or unreliable. For guidance on developing this draft, see Wikipedia:So you made a userspace draft. Finished writing a draft article? Are you ready to request an experienced editor review it for possible inclusion in Wikipedia? |
Test Sections
Preliminary Requirements
The following conditions must be true before starting the work:
- Main reservoirs drained.[1]
- 600 Vdc power removed from the vehicle.
- Train is powered on.
Main Power On: Instructions
Hazardous voltages. Be careful when working around hazardous voltages |
Pneumatic hazards. Drain all main reservoirs before proceeding with the work. |
Prepare Train for Inspection
- Make sure that there are no personnel on the train.
- Disconnect the auxiliary power supply.
- Go to the auxiliary power inverter.
- Open the main cover.
- Disconnect circuit breaker CB201.
- Continue on to the next step.
Put back something
- This is the first step.
Do not do this before you do this, or property damage may occur. |
- This is the second step.
- Torque stuff to 10 lb⋅ft (13.56 N⋅m).
Special Features
References
- ^ Main_reservoirs
External links