This is a file from the Wikimedia Commons. Information from its description page there is shown below. Commons is a freely licensed media file repository. You can help.
Summary
DescriptionUS soldiers patrolling the streets of Asadabad-5.jpg
English: A Provincial Reconstruction Team-Kunar patrol conducts a final quality assurance and quality check in downtown Asadabad on a new 4-kilometer road through the provincial capital prior to a dedication ceremony, Dec. 13, 2009. The Provincial Reconstruction Team-Kunar engineers did the check to ensure the Kunar Construction Company did a good job building the road. The project took nearly one year and approximately $1 million to complete. The hope for the new road is it will continue to spur economic development and job growth in the city. More than 50 provincial leaders and tribal elders gathered at the ceremony site after the QA/QC check to do the ribbon cutting ceremony. (Photo ID: 231126)
Date
Taken on 13 December 2009
Source
This image was released by the United States Air Force with the ID 091213-F-#####-009 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required.See Commons:Licensing.
العربية ∙ বাংলা ∙ Deutsch ∙ Deutsch (Sie-Form) ∙ English ∙ español ∙ euskara ∙ فارسی ∙ français ∙ italiano ∙ 日本語 ∙ 한국어 ∙ македонски ∙ മലയാളം ∙ Plattdüütsch ∙ Nederlands ∙ polski ∙ پښتو ∙ português ∙ русский ∙ slovenščina ∙ svenska ∙ Türkçe ∙ українська ∙ 简体中文 ∙ 繁體中文 ∙ +/−
Author
Master Sgt. Brian Boisvert (U.S. Armed Forces)
Licensing
Public domainPublic domainfalsefalse
This image or file is a work of a U.S. Air Force Airman or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image or file is in the public domain in the United States.
العربية ∙ беларуская (тарашкевіца) ∙ català ∙ čeština ∙ Deutsch ∙ English ∙ español ∙ eesti ∙ فارسی ∙ suomi ∙ français ∙ italiano ∙ 日本語 ∙ 한국어 ∙ македонски ∙ മലയാളം ∙ မြန်မာဘာသာ ∙ norsk bokmål ∙ Plattdüütsch ∙ Nederlands ∙ polski ∙ português ∙ português do Brasil ∙ русский ∙ sicilianu ∙ slovenčina ∙ slovenščina ∙ српски / srpski ∙ svenska ∙ Türkçe ∙ українська ∙ Tiếng Việt ∙ 中文(简体) ∙ 中文(繁體) ∙ +/−
Captions
Add a one-line explanation of what this file represents
Items portrayed in this file
depicts
inception
13 December 2009
captured with
Nikon D300
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time
Thumbnail
Dimensions
User
Comment
current
23:06, 10 November 2012
3,600 × 2,400 (1.06 MB)
Officer
{{Information |Description={{en|1=A Provincial Reconstruction Team-Kunar patrol conducts a final quality assurance and quality check in downtown Asadabad on a new 4-kilometer road through the provincial capital prior to a dedication ceremony, Dec. 13, ...
File usage
The following pages on the English Wikipedia use this file (pages on other projects are not listed):
A Provincial Reconstruction Team-Kunar patrol conducts a final quality assurance and quality check in downtown Asadabad on a new 4-kilometer road through the provincial capital prior to a dedication ceremony, Dec. 13, 2009. The Provincial Reconstruction Team-Kunar engineers did the check to ensure the Kunar Construction Company did a good job building the road. The project took nearly one year and approximately $1 million to complete. The hope for the new road is it will continue to spur economic development and job growth in the city. More than 50 provincial leaders and tribal elders gathered at the ceremony site after the QA/QC check to do the ribbon cutting ceremony. (U.S. Air Force photo by TSgt Brian Boisvert, Kunar Provincial Reconstruction Team Public Affairs/RELEASED)